Usage Note 11958: Drilldown performance in SAS ABM 6.1 OLAP may be poor with cubes created
from some large models
Due to an undocumented problem with parent-child dimension schemas in
Microsoft Analysis Services, pre-aggregations in SAS Activity-Based
Management 6.1 OLAP cubes are not being calculated during cube
processing.
Consequently, all aggregations have to be calculated during
interactive drilldown. In cubes containing more than a few dimensions,
each with many levels and members, this could result in delays of up to
several minutes each time a user drills down into an item within an OLAP
view.
A Technical Support hot fix for this issue is available at:
http://www.sas.com/techsup/download/hotfix/abm61.html#011958
Operating System and Release Information
SAS System | SAS Activity-Based Management | Microsoft Windows 2000 Server | 6.1 | | | |
Microsoft Windows 2000 Datacenter Server | 6.1 | | | |
Microsoft Windows 2000 Advanced Server | 6.1 | | | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Usage Note |
Priority: | high |
Date Modified: | 2004-03-29 09:31:28 |
Date Created: | 2004-03-12 09:37:57 |