After you run a task via the SAS® Campaign Management Multi-threaded Scheduler, the short message that is displayed in the Reminders window shows a timestamp that is 1 hour behind the actual time that the task ran. The timestamp for the long reminder message, however, is correct.
A hot fix for this issue is available only for use with the NCR Teradata database. Click the Hot Fix tab in this note to access the hot fix for this issue.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Campaign Management | Microsoft Windows XP Professional | 7.5 | 7.5 | 8.2 TS2M0 | |
Microsoft Windows NT Workstation | 7.5 | 7.5 | 8.2 TS2M0 | |||
Microsoft Windows 2000 Server | 7.5 | 7.5 | 8.2 TS2M0 | |||
Microsoft Windows 2000 Professional | 7.5 | 7.5 | 8.2 TS2M0 | |||
Microsoft Windows 2000 Advanced Server | 7.5 | 7.5 | 8.2 TS2M0 | |||
Microsoft Windows 2000 Datacenter Server | 7.5 | 7.5 | 8.2 TS2M0 |