Example 8 for PROC LOGISTIC
/****************************************************************/
/* S A S S A M P L E L I B R A R Y */
/* */
/* NAME: LOGIEX8 */
/* TITLE: Example 8 for PROC LOGISTIC */
/* PRODUCT: STAT */
/* SYSTEM: ALL */
/* KEYS: logistic regression analysis, */
/* binomial response data, */
/* PROCS: LOGISTIC */
/* DATA: */
/* */
/* SUPPORT: Bob Derr */
/* REF: SAS/STAT User's Guide, PROC LOGISTIC chapter */
/* MISC: */
/* */
/****************************************************************/
/*****************************************************************
Example 8. Comparing Receiver Operating Characteristic Curves
*****************************************************************/
/*
Delong, Delong, and Clarke-Pearson (1988) report on 49 patients with ovarian
cancer who also suffer from an intestinal obstruction. Three (correlated)
screening tests are measured to determine whether a patient will benefit from
surgery. The three tests are the K-G score and two measures of nutritional
status: total protein and albumin.
This example illustrates how to use PROC LOGISTIC to compute and display the
ROC curves for the three tests, and how to compare the tests.
*/
title 'Example 8: Comparing ROC Curves';
data roc;
input alb tp totscore popind @@;
totscore = 10 - totscore;
datalines;
3.0 5.8 10 0 3.2 6.3 5 1 3.9 6.8 3 1 2.8 4.8 6 0
3.2 5.8 3 1 0.9 4.0 5 0 2.5 5.7 8 0 1.6 5.6 5 1
3.8 5.7 5 1 3.7 6.7 6 1 3.2 5.4 4 1 3.8 6.6 6 1
4.1 6.6 5 1 3.6 5.7 5 1 4.3 7.0 4 1 3.6 6.7 4 0
2.3 4.4 6 1 4.2 7.6 4 0 4.0 6.6 6 0 3.5 5.8 6 1
3.8 6.8 7 1 3.0 4.7 8 0 4.5 7.4 5 1 3.7 7.4 5 1
3.1 6.6 6 1 4.1 8.2 6 1 4.3 7.0 5 1 4.3 6.5 4 1
3.2 5.1 5 1 2.6 4.7 6 1 3.3 6.8 6 0 1.7 4.0 7 0
3.7 6.1 5 1 3.3 6.3 7 1 4.2 7.7 6 1 3.5 6.2 5 1
2.9 5.7 9 0 2.1 4.8 7 1 2.8 6.2 8 0 4.0 7.0 7 1
3.3 5.7 6 1 3.7 6.9 5 1 3.6 6.6 5 1
;
ods graphics on;
proc logistic data=roc plots=roc(id=prob);
model popind(event='0') = alb tp totscore / nofit;
roc 'Albumin' alb;
roc 'K-G Score' totscore;
roc 'Total Protein' tp;
roccontrast reference('K-G Score') / estimate e;
run;
ods graphics off;