The Earned Value Management Macros
This macro is used to obtain a plot of the cost and schedule performance indices over time. If the project has not been completed,
the To-Complete Performance Index (Budget at Completion version) is also displayed. The legend includes the Planned Value,
Earned Value, and Actual Cost.
%EVG_INDEX_PLOT
< ( parameters ) > ;
Note: %EVG_INDEX_PLOT requires output from %EVA_METRICS.
-
ACRONYMS=
long
-
specifies whether the long form of the earned value acronyms is to be used—e.g., BCWP versus EV. The short form is used unless
the macro variable _ACRONYMS_
is set to “long” or ACRONYMS=long is specified. The parameter overrides the macro variable setting; i.e., specifying any non-null value other
than “long” for the ACRONYMS= parameter produces short forms.
-
METRICS=
SAS-data-set
-
identifies the periodic metrics data set produced by the %EVA_METRICS macro, the name of which is determined by the METRICS=
parameter of %EVA_METRICS. The default data set name is METRICS
.
-
PLOT=
SAS-data-set
-
specifies the name of the output data set. This is an internal data set that is used as input to the plotting procedure. The
default data set name is PLOT
.
-
SUMMARY=
SAS-data-set
-
identifies the summary data set from the %EVA_METRICS macro, the name of which is determined by the SUMMARY= parameter of
%EVA_METRICS. The default data set name is SUMMARY
.
Table 11.7 summarizes the parameters used for managing input and output data sets in the %EVG_INDEX_PLOT macro.
Table 11.7: %EVG_INDEX_PLOT I/O Parameter Summary
Type
|
Data Set
|
INPUT
|
METRICS
|
INPUT
|
SUMMARY
|
OUTPUT
|
PLOT
|