The Earned Value Management Macros

%EVG_SCHEDULE_PLOT

This macro is used to display planned and projected completion times for the project. Specifically, the status date is shown, along with the planned finish time, the revised finish time, and the projected finish time.

Note:%EVG_SCHEDULE_PLOT requires output from %EVA_METRICS.

Optional Parameters

ACRONYMS= long

specifies whether the long form of the earned value acronyms is to be used—e.g., BCWP versus EV. The short form is used unless the macro variable _ACRONYMS_ is set to "long" or ACRONYMS=long is specified. The parameter overrides the macro variable setting; i.e., specifying any non-null value other than "long" for the ACRONYMS= parameter produces short forms.

METRICS= SAS-data-set

identifies the periodic metrics data set produced by the %EVA_METRICS macro, the name of which is determined by the METRICS= parameter of %EVA_METRICS. The default data set name is METRICS.

PLOT= SAS-data-set

specifies the name of the output data set. This is an internal data set that is used as input to the plotting procedure. The default data set name is PLOT.

Table 11.6 summarizes the parameters used for managing input and output data sets in the %EVG_SCHEDULE_PLOT macro.

Table 11.6 %EVG_SCHEDULE_PLOT I/O Parameter Summary

Type

Data Set

INPUT

METRICS

OUTPUT

PLOT