The EXCESS=DEMAND Option

If you specify the EXCESS=DEMAND option, then there are three possible scenarios to deal with:

Case 1: No Node with Missing S Supply, THRUNET Not Specified (see Figure 6.36)


Supply the excess demand to all demand nodes directly.

Figure 6.36 Nodes with Missing D Demand
 Nodes with Missing D Demand

Case 2: Some Nodes with Missing S Supply, THRUNET Not Specified (see Figure 6.37)


Supply the excess demand by the nodes that have a missing S supply value. If a node has a missing S supply value, then the amount it supplies is determined by optimization. For a supply node with a positive supdem value, that value is equal to the sum of flows on all actual arcs directed away from that node.

Figure 6.37 Nodes with Missing S Supply
 Nodes with Missing S Supply

Case 3: THRUNET Specified (see Figure 6.38)


Supply the excess demand by all supply nodes. If a node has a positive supdem value, that value is the lower bound on the sum of flows on all actual arcs directed away from that node. If a node has a missing S supply value, then the amount it supplies is determined by optimization.

Figure 6.38 Nodes with Missing S Supply, THRUNET Specified
Nodes with Missing S Supply, THRUNET Specified