| The BOM Procedure |
The following table references the options in the BOM procedure that are illustrated by the examples in this section. Note that the DATA=, DUPLICATE=, OUT=, PMDATA=, and SUMMARYOUT= options are specified on the PROC BOM statement. All other options are specified on the STRUCTURE statement.
Table 2.7: Options Specified in Examples| Option | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| COMPONENT= | X | X | X | X | X | X | X | X | X | X |
| DATA= | X | X | X | X | X | X | X | X | X | X |
| DUPLICATE= | X | |||||||||
| ENDITEM= | X | |||||||||
| FACTOR= | X | X | X | |||||||
| ID= | X | X | X | X | X | X | X | X | X | X |
| LEADTIME= | X | X | X | X | X | X | ||||
| OFFSET= | X | X | ||||||||
| OUT= | X | X | X | X | X | X | X | X | X | X |
| PARENT= | X | X | X | X | X | X | X | X | X | X |
| PART= | X | X | X | X | X | X | X | X | X | X |
| PMDATA= | X | X | X | X | X | X | ||||
| QTYONHAND= | X | X | ||||||||
| QUANTITY= | X | X | X | X | X | X | X | X | X | X |
| REQUIREMENT= | X | X | X | X | ||||||
| RID= | X | X | ||||||||
| SUMMARYOUT= | X | X | X | X | X | X |
Copyright © 2008 by SAS Institute Inc., Cary, NC, USA. All rights reserved.