To create performance
monitoring reports for all projects within a portfolio, you create
and execute a performance definition for all projects within a portfolio.
Execution of the generated code creates the SAS data sets that are
used to display the performance monitoring reports on the Performance page
of each project.
To monitor the performance
of the champion models for all projects:
-
On the
Performance page
of a portfolio, click
.
-
Select one or more output
variables for stability analysis. To select all output variables,
click All.
-
Select one or more input
variables for characteristic analysis. To select all input variables,
click All.
Click Next.
-
Specify the performance
data options.
-
Click Browse to
select the performance data source.
Note: The performance data source
must contain the same segment identifier variables as the control
table.
-
To run the score code in the performance
monitor job, select the Run model score code check
box. If the check box is not selected, all of the output variables
for stability analysis must be in the performance data source.
-
Click
and select a date. The date can be any date in the
time period when the performance data was collected.
-
Enter a report label to associate
with the performance data. The report label represents the time point
of the performance data source. Because the report label appears in
the performance charts, use a label that has not been used for another
time period, is short, and is understandable (for example, Q1).
Note: If you duplicate report labels,
previous performance results are overwritten.
-
Specify the properties
that are used to generate the performance monitoring reports. The
properties default to the values that were set when you created a
portfolio.
Click Next.
-
(Optional) Specify values
for the alert and warning conditions or accept the defaults.
-
(Optional) To send the
results by email, click
. A new row is added to the table.
-
-
Select Yes
if you want an alert or warning to be sent by email when alert or
warning thresholds have been exceeded.
-
Select Yes
if you want a completion notice with the job status to be sent by
email every time the report runs.
-
-
Click
.
-
After the performance
monitoring is complete, a confirmation message appears. Click Close.
-
To view the performance
results, select the Projects page, and open
a project. Select the Performance page to
view results.