Problem Note 10472: Multi-threaded Scheduler task runs one hour later than the time it was
scheduled to run
The SAS Campaign Management Multi-threaded Scheduler runs tasks one hour
later than the time you originally schedule the task to execute. This
problem only occurs when Daylight Savings time is in effect.
A Technical Support hot fix for this issue, currently only for use with
the NCR Teradata database, is available at:
http://ftp.sas.com/techsup/download/hotfix/cammts75.html
Operating System and Release Information
| Product Family | Product | System | Reported Release | Fixed Release* |
| SAS System | SAS Campaign Management | Microsoft Windows 2000 Server | 3.1 | 3.2 |
| Microsoft Windows NT Workstation | 3.1 | 3.2 |
| Microsoft Windows 2000 Advanced Server | 3.1 | 3.2 |
| Microsoft Windows 2000 Datacenter Server | 3.1 | 3.2 |
| Microsoft Windows 2000 Professional | 3.1 | 3.2 |
| Microsoft Windows XP Professional | 3.1 | 3.2 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
| Type: | Problem Note |
| Priority: | high |
| Topic: | System Administration ==> Scheduling
|
| Date Modified: | 2003-10-09 15:03:28 |
| Date Created: | 2003-07-22 11:37:56 |