|
Chapter Contents |
Previous |
Next |
| The X12 Procedure |
The date variable (or _DATE_ ) values outside the range of the actual data (from forecasting) are extrapolated, while all other ID variables are missing.
|
Chapter Contents |
Previous |
Next |
Top |
Copyright © 2001 by SAS Institute Inc., Cary, NC, USA. All rights reserved.