Problem Note 69023: IPC connection errors occur when you use drill-down, recalculate, or save functions in certain worksheets
In SAS® Merchandise Planning, you might experience IPC connection errors when executing certain functions inside a worksheet. These functions include the following:
- Drilling down on or expanding the Time dimension
- Auto-recalculating after an edit of a Working Plan key performance indicator (KPI)
- Recalculating a task or worksheet
- Saving or submitting
If you review the peinst_#######_####_pe.log for the worksheet that had the IPC connection error, the last lines are similar to the following:
<LogMsg Type='Information' Uptime='87'>Begin HandleTimeBasedField<LogDetails File='CalcEngineImpl.cpp' Line='584' LocalTime='Mon Mar 21 10:54:16 2022' SystemTime='1647874456' /></LogMsg>
#
# A fatal error has been detected by the Java Runtime Environment:
#
# SIGSEGV (0xb) at pc=0x00007f44f4f3cdd0, pid=21338, tid=0x00007f44f4173700
#
# JRE version: Java(TM) SE Runtime Environment (8.0_162-b12) (build 1.8.0_162-b12)
# Java VM: Java HotSpot(TM) 64-Bit Server VM (25.162-b12 mixed mode linux-amd64 compressed oops)
# Problematic frame:
# C [libCalcEngine.so+0xbbdd0] CRuleEvaluator::SetCell(SFactNode*)+0x0
This issue is found when there are KPIs that use a fwdnxt() function in their calculation.
There are no workarounds.
Operating System and Release Information
SAS System | SAS Merchandise Financial Planning | 64-bit Enabled AIX | 6.8 | 6.8 | 9.4 TS1M6 | 9.4 TS1M7 |
Linux for x64 | 6.8 | 6.8 | 9.4 TS1M6 | 9.4 TS1M7 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2022-05-03 09:58:29 |
Date Created: | 2022-03-23 11:43:16 |