Problem Note 61309: A prompt is missing inside worksheets with multiple tasks that alerts you to recalculate the worksheet before executing a task switch
In SASĀ® Merchandise Planning, a prompt is missing inside worksheets with multiple tasks that alerts you to recalculate the worksheet before executing a task switch. You can currently edit a KPI and switch tasks without recalculating.
In prior releases, a prompt would be triggered to alert you that a recalculation would occur prior to the task switch executing, or you could return to the current task.
If you switch tasks, a recalculation can still occur on the new task, or you can return to the previous task and perform the recalculation there.
Operating System and Release Information
SAS System | SAS Merchandise Financial Planning | Microsoft Windows Server 2012 R2 Std | 6.7 | 6.8 | 9.4 TS1M4 | 9.4 TS1M5 |
64-bit Enabled AIX | 6.7 | 6.8 | 9.4 TS1M4 | 9.4 TS1M5 |
Linux for x64 | 6.7 | 6.8 | 9.4 TS1M4 | 9.4 TS1M5 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2018-01-03 10:08:42 |
Date Created: | 2017-10-27 13:19:52 |