| The CALENDAR Procedure |
| Alias: | HOLIVARIABLE, HOLINAME |
| Calendar type: | Summary and schedule |
| Default: | If you do not use a HOLIVAR statement, then PROC CALENDAR uses the word DATE to identify holidays. |
| Featured in: | Schedule Calendar with Holidays: 5-Day Default through Schedule Calendar, Blank or with Holidays |
| HOLIVAR variable; |
| Required Arguments |
a variable whose values are used to label the holidays. Typically, this variable contains the names of the holidays.
| Range: | character or numeric. |
| Restriction: | This variable must be in the holidays data set. |
| Tip: | You can format the HOLIVAR variable as you like. |
Copyright © 2010 by SAS Institute Inc., Cary, NC, USA. All rights reserved.