The DTREE Procedure |
Value of Perfect Control |
The oil wildcatter may also want to know what the value of perfect control (VPC) is on the cost of drilling. That is, how much is he willing to pay for getting complete control on the drilling cost? This analysis can be performed with the following statement:
vpc Cost;
The result is written to the SAS log as
NOTE: The currently optimal decision yields 140000. NOTE: The new optimal decision yields 300000. NOTE: The value of perfect control of stage Cost yields 160000.
Copyright © SAS Institute, Inc. All Rights Reserved.