Opencast Mining: How Much to Excavate


Input Data

The following data sets and macro variable contain the input data that are used in this example:

data block_data;
   input level row column percent;
   datalines;
1 1 1  1.5
1 1 2  1.5
1 1 3  1.5
1 1 4  0.75
1 2 1  1.5
1 2 2  2.0
1 2 3  1.5
1 2 4  0.75
1 3 1  1.0
1 3 2  1.0
1 3 3  0.75
1 3 4  0.5
1 4 1  0.75
1 4 2  0.75
1 4 3  0.5
1 4 4  0.25
2 1 1  4.0
2 1 2  4.0
2 1 3  2.0
2 2 1  3.0
2 2 2  3.0
2 2 3  1.0
2 3 1  2.0
2 3 2  2.0
2 3 3  0.5
3 1 1 12.0
3 1 2  6.0
3 2 1  5.0
3 2 2  4.0
4 1 1  6.0
;

data level_data;
   input cost;
   datalines;
3000
6000
8000
10000
;

%let full_value = 200000;