What’s New in SAS/OR 9.22 |
The GANTT procedure produces a Gantt chart, which is a graphical tool for representing schedule-related information. PROC GANTT provides support for displaying multiple schedules, precedence relationships, calendar information, milestones, reference lines, labeling, and so on. New in SAS/OR 9.22 is the TIMEAXISFORMAT= option in the CHART statement which provides the capability to customize the format of the time axis on the Gantt chart for up to three rows. Each row can be formulated using a predefined SAS format or a user-defined format.
Copyright © SAS Institute, Inc. All Rights Reserved.