Previous Page | Next Page

The GCHART Procedure

Examples

Note:   When using procedures that support RUN-group processing, include a QUIT statement after the last RUN statement. Using the QUIT statement is especially important when the procedure is supposed to completely terminate within the boundaries of an ODS destination (for example, ODS HTML; procedure-code; ODS HTML CLOSE; ). See RUN-Group Processing for more information.  [cautionend]


[continuerule]

Example 1: Specifying the Sum Statistic in a Block Chart

Example 2: Grouping and Subgrouping a Block Chart

Example 3: Specifying the Sum Statistic in Bar Charts

Example 4: Subgrouping a Three-Dimensional Vertical Bar Chart

Example 5: Controlling Midpoints and Statistics in a Horizontal Bar Chart

Example 6: Generating Error Bars in a Horizontal Bar Chart

Example 7: Specifying the Sum Statistic for a Pie Chart

Example 8: Subgrouping a Donut or Pie Chart

Example 9: Ordering and Labeling Slices in a Pie Chart

Example 10: Grouping and Arranging Pie Charts

Example 11: Specifying the Sum Statistic in a Star Chart

Example 12: Charting a Discrete Numeric Variable in a Star Chart

Example 13: Creating a Detail Pie Chart

Previous Page | Next Page | Top of Page