Perform
the following steps to add a join to the Diagram tab:
-
Select
one of the join objects in the
Joins folder
in the SQL Clauses pane, and drop it in a blank space on the
Diagram tab.
-
Disconnect
the existing join from the Select object. Click on the arrow between
the Join and the Select object. Then, press DELETE to remove the arrow.
The new join and the original join are displayed in the query flow,
as shown in the following display.
-
Move the
new join to an appropriate location. Then, complete the following
actions:
-
Connect the original join to one
input port of the new join.
Note: If you select
a Join node on the diagram, then the new join node will be inserted
after the join that you selected.
-
Drop the source table for the new join onto the Diagram tab.
-
Connect the table to the remaining
input port of the new join.
-
Connect the new join to the input
port of the Select object.
Note: If you select
the Select node on the diagram, then the join is automatically connected
or inserted between the Select node and the Join node.
A sample job that includes an added join is shown in the following display.
Note: You can add
the source and target tables directly to the process flow diagram
for the job in the Diagram tab for the Job Editor window. You can also add a table, join, or
subquery to a job by dragging and dropping it on the Diagram tab in the Designer window for the SQL
Join transformation.